Welcome to LoudounTimes.com
Loudoun Times-Mirror

Sycolin overpass contract awarded

The Sycolin Road overpass of Route 7/Route 15 in Leesburg will be designed by the Dewberry national professional services team for Shirley Contracting Company.

The grade-separated bridge for Sycolin will include two northbound and two southbound 12-foot travel lanes, a sidewalk and a barrier-separated shared-use path. It will remove the existing signal intersection.

The project is estimated to cost $19.6 million and is designed to improve safety in the area.

Dewberry was also the designer for Battlefield Parkway and the Dulles Greenway, which will replace the existing access to the bypass from Sycolin Road.

For more information on this and other traffic projects, visit virginiadot.org.


Be the first to post a comment!

Post a comment

Commenting is not available in this channel entry.

Comments express only the views of the author and do not necessarily reflect the views of this website or any associated person or entity. Any user who believes a message is objectionable can contact us at [email protected].

More News

Leesburg WEATHER
Today Tomorrow

Light rain

Hi 40° Hi 53°
Lo 38° Lo 49°
More Weather
The Loudoun Times-Mirror

is an interactive, digital replica
of the printed newspaper.
Open the e-edition now.